Step 14: Mount the Secondary, Toroid, and Breakout Point

  • A. Place the secondary tube over the main board, orienting the notches appropriately. Use M3 screws to mount the tube. Don’t over-tighten!

 

Secondary mounting

 

  • B. Plug in the primary coil connector.
  • C. Mount the toroid onto the secondary tube and fasten it using an M6 nut.

 

Attach the toroid

 

  • D. Place the breakout point straight across the toroid. It should stick out about 3 inches. The breakout point should simply lay across the top, but if you want to hold it in place you can use some aluminum tape.

 

Place the breakout point

 

 

<< Previous: Step 13    |    Next: Step 15 >>